Advertisement No. & date |
Item |
Last date of submission |
Date of Opening |
| |
|
|
|
| No.3(POQ)138_09-10_PUR_T-318_dtd1.3.2010.pdf |
Mail Server solution for 500 mail box with standard protocols like SMTP,IMAP, POP,MIME,HTTP,LDAP etc on open source components and migration of existing mail server running on Linux to the proposed new mail server |
7.4.2010 up to 2.30pm |
7.4.2010 at 3.00pm |
| No.3(POQ)_134_09-10_PUR_T-314.dtd 26.2.2010 |
High speed Benchtop centrifuge with different rotor and essential accessories |
7.4.2010 up to 2.30pm |
7.4.2010 at 3.00pm |
| No.3(POQ)_135_09-10_PUR_T-317dtd 26.2.2010 |
UPS 10kva with 6hrs backup and concealed battery shelves / cabinet |
7.4.2010 up to 2.30pm |
7.4.2010 at 3.00pm |
| No. NEIST/05/10-11/Security (Manipur) dtd26.2.2010 |
providing the security arrangements at North-East Institute of Science & Technology (NEIST) (Formerly RRL, Jorhat) Sub-Station, Imphal, Manipur |
15.03.2010 up to 12.30 P.M. |
15.03.2010 at 2.30 P.M. |
| No.3(POQ)137_09-10_PUR_T-315dtd25.2.2010.pdf |
1. Autoclave
2.Laminar Air Flow,
3. Water Purifier |
7.4.2010 up to 2.30pm |
7.4.2010 at 3.00pm |
| NIT_NO.WEB_012_W_2010dtd25.2.2010.pdf |
Painting works of Laboratoratory buildings of NEIST, Jorhat |
08-03-2010 up to 3.00pm |
08-03-2010 at 3.30pm |
| No.NEIST-Elect-02/2010 dtd24.2.2010.pdf |
1. Installation of OTI & WTI in Power House Transformer room at NEIST, Jorhat
2.Underground service connection to facility creation centre at NEIST, Jorhat |
up to 2.30pm on 03.03.2010 |
at 3.00pm on 03.03.2010 |
| No.3(POQ)132_09-10_PUR_dtd16.2.2010.pdf |
1. Source Meter
2.Spin processor |
up to 2.30pm on 10.3.2010 |
at 3.00pm on 10.3.2010 |
| No.1(PEQ)_386_09-10_PUR_T-311_Date 16.02.10.pdf |
A Real-time PCR Machine (RT-PCR) |
2.3.2010 up to 4.00pm |
3.3.2010 at 3.00pm |
| No.1(PEQ)_387_09-10_PUR_309_Date16.02.10.pdf |
Microwave Solvent Extraction Unit |
2.3.2010 up to 4.00pm |
3.3.2010 at 3.00pm |
| No.1(PEQ)_388_09-10_PUR_T-310_ Date16.02.10.pdf |
Bench-top Vacuum Concentrator |
2.3.2010 up to 4.00pm |
3.3.2010 at 3.00pm |
| No.1(PEQ)_389_09-10_PUR_T-313_Date16.02.10.pdf |
Microprocessor Controlled Electrochemical Analyzer Having Potentiostatic and Galvanostatic Facilities |
2.3.2010 up to 4.00pm |
3.3.2010 at 3.00pm |
| No.1(PEQ)_390_09-10_PUR_T-312_Date16.02.10.pdf |
Flash Chromatography System (Sepacore system) |
2.3.2010 up to 4.00pm |
3.3.2010 at 3.00pm |
| No.1(PEQ)_391_09-10_PUR_T-307_Dat16.02.10.pdf |
High Pressure Reactor |
2.3.2010 up to 4.00pm |
3.3.2010 at 3.00pm |
| No.1(PEQ)_392_09-10_PUR_T-308_Date16.02.10.pdf |
A Gel Documentation System |
2.3.2010 up to 4.00pm |
3.3.2010 at 3.00pm |
| No.3.(POQ)/127/09-10/PUR/T-302 dtd 11.2.2010 |
Freeze dryer 6L.Cap operable at 230v |
1.3.2010 up to 2.30pm |
1.3.2010 at 3.00pm |
| No.3.(POQ)/127/09-10/PUR/T-303 dtd 11.2.2010 |
1. Portable Ultra Sound Scanner
2. B/W Thermal Printer for Ultra Sound |
1.3.2010 up to 2.30pm |
1.3.2010 at 3.00pm |
| No. NIT/WEB/011/W/2010 dated: 08-02-2010 |
1. Painting the wall of Tissue Culture Laboratory with water proofing paint and fixing Granite on walls
2. Renovation of Shed No. 4 of Pilot Plant for setting up a Chemical Laboratory at NEIST, Jorhat
3. Repairing and Internal Painting Work of 14 Nos. E-type qtrs at NEIST, Jorhat |
up to 3:00 p.m on 15-02-2010 |
At 3:30 p.m on 15-02-2010 |
| GNIT-NO.III-9-10_dtd.8.2.2010.pdf |
1. High Resolution Digital Broadband Seismograph
2. GPR [Ground Penetrating Radar] for shallow sub-surface investigation.
3. Simultaneous Thermal Analyzer
|
04th March 2010 4.00 P.M. IST |
05th March 2010 10.00 A.M. IST |
| No.NEIST-Elect-01/2010 dtd 22.1.2010 |
1. Installation of Distribution Panel Board in Power House at NEIST, Jorhat.
2. Replacement of old Panel Boards in individual Block at NEIST, Jorhat
3. Electrical renovation works to Canteen Building at NEIST, Jorhat. |
2-30 PM on 08.02.2010 |
08.02.2010 at 3-30 PM |
| No.1.PEQ.372.09-10 ENQ. dt.21.1.2010 |
Audio System and Display Devices with Complete Installations, Commissioning, Programming and Demonstrations |
10.02.10 UP TO 2.30PM |
10.02.10 AT 3.00 PM |
N I T-No.1(PEQ)37909-10PURII 09-10dtd8.1.2010
Corrigendum dtd 3.2.2010 |
Supply & Installation of Instruments / apparatus on turnkey basis to be installed in 58 Nos. of Science Colleges in 8 (Eight) States in North East Region. |
16.02.2010 up to 17.00 HRS |
17.02.2010 at 10.00 HRS |
No. NIT/WEB/010/W/2010 dtd 6.1.2010
corrigendum dtd 18.1.2010 |
Renovation of Mushroom Cultivation Unit and Insectory Building at NEIST, Jorhat |
11.1.2010 up to 3.00pm |
11.1.2010 at3.30pm |
No.RLJ-29(1197)W_09_30.12.2009
Corrigendum dtd.6.1.2010
corrigendum dtd 18.1.2010 |
Sl.No |
Name of Work |
1. |
Renovation of Kitchen near lounge with ceramics tiles on both wall and floor and wooden works. |
2. |
Providing VISTA roller blind in the newly renovated conference hall of the Main Block. |
3 |
Providing Ceramic tiles floor for Incinator shed at NEIST, Joraht. |
|
4.1.2010 up tp 3.00pm |
4.1.2010 at 3.30pm |
| No.NEIST/Electrical-12/2009dtd 9.12.2009 |
1.
2.
3. |
Wiring works to applied Chemistry Building
Wiring works to Bio-Tech Building
Replacement of feeder boxes |
|
24.12.2009 up to 3.00pm |
24.12.2009 at 3.30pm |
| NIT No.RLJ-29(1166)W/09 dtd 9.12.2009 |
Sl.No |
Name of Work |
Link to price bid . |
Link to Technical Bid |
1. |
Renovation work of auditorium at NEIST, Jorhat(b)Replacement of Chairs |
click here to download
|
click here to download |
2. |
Renovation and modernization of the Canteen building |
click here to download
|
click here to download
|
3. |
Conversion of 1st floor of the Organic Chemistry Building to a modern laboratory with Structural Glazing, amstrong ceiling, toilets etc. |
click here to download
|
click here to download |
4 |
Conversion of 1st floor of the Bio-Technology Building to a modern laboratory with Structural Glazing, amstrong ceiling, toilets etc. |
click here to download
|
click here to download |
5 |
Waterproofing treatment over RCC roof with APP membrane for the buildings (Engg. Block, Library- Journal Sec, Main Building, Auditorium) of the laboratory campus |
click here to download
|
click here to download
|
6 |
Waterproofing treatment over RCC roof with Tarfelt-BH,T-3,GR-1, ISI 1322 of the buildings (B,25-56 C,4-6,9,19,19-26) of the Colony campus |
click here to download
|
click here to download
|
7 |
Providing tubular roof truss with poly coated trapezoidal coloured roofing sheet over existing E type (E,5-14) building at NEIST, colony campus |
click here to download
|
click here to download
|
|
23.12.2009 up to 1.00pm |
23.12.2009 at 2.00pm |
| NOTICE INVITING TENDER No. I/2009 - 10 dtd 1.12.2009 |
1 |
1(PEQ)/256/08-09/PUR |
Supply & Installation of PC based Software for Drilling and Well Control Simulation |
2 |
1(PEQ)/368/09-10/PUR |
Supply & Installation of High Speed Quick Resolution HPLC (UPLC, RRLC etc.) |
3 |
1(PEQ)/376/09-10/PUR |
Supply & Installation of Laser Diffraction Particle Size Analyzer |
4 |
1(PEQ)/349/09-10/PUR |
Supply & Installation of Ion Chromatography System (PC Based) |
5 |
1(PEQ)/369/09-10/PUR |
Supply & Installation of High Temperature Dynamic Mechanical Analyzer along with Window based software |
|
29.12.09 up to 17.00hrs |
30.12 .09 at 10.00 HRS |
| No.NEIST/NIT/01/Pharmacy/2009 dtd 30.11.2009 |
Sealed Tenders are invited from the Registered Pharmacies to open a Pharmacy in the Clinical Center of NEIST, Jorhat to supply medicines to employees / Pensioners and their dependant family members based on the prescriptions of our Doctors |
29.12.2009 up to12.30 P.M |
29.12.2009 at 2.30 P.M |
| No. 1(PEQ)/370/09-10/PUR/260 Date 11.11.09 |
Automated atmospheric distillation unit for quantitative determination of boiling range characteristics of light and middle petroleum distillates and bio -diesel |
09.12.09 UP TO 2.30PM |
09.12.09 AT 3.00 PM |
| No. 1(PEQ)/371/09-10/PUR/T- 261 Date 11.11.09 |
Supply & Installation of IP Camera Out-Door with all accessories |
09.12.09 UP TO 2.30PM |
09.12.09 AT 3.00 PM |
| No. 1(PEQ)/372/09-10/PUR/T- 262 Date 11.11.09 |
Audio System and Display Devices with Complete Installations, Commissioning, Programming and Demonstrations: |
09.12.09 UP TO 2.30PM |
09.12.09 AT 3.00 PM |
| No. 1(PEQ)/374/09-10/PUR/T- 264 |
Computer Controlled Double Beam UV-Visible Spectrophotometer with ability to correct for blanks in real time |
09.12.09 UP TO 2.30PM |
09.12.09 AT 3.00 PM |
| No. RLJ-29(1201)W/09 5th November 2009 |
Sealed item rates tenders for some petty civil engineering works from contractors of appropriate category worked with CPWD, State PWD, MES or those who have carried out similar type of works for CSIR laboratoty. |
20.11.2009 up tp 3.00pm |
20.11.2009 at 3.30pm |
| No . NEIST-Elect-13/2009 dtd 30.10.2009 |
Electrical renovation works to Auditorium Building at NEIST, Jorhat |
11.11.2009 up to 3.00pm |
11.11.2009 at 3.30pm |
| No. NEIST/04/09-10/Project dtd 19.10.2009 |
Providing Un-skilled workers for Field Oriented and other project work at North-East Institute of Science & Technology (NEIST), Jorhat |
10.11.2009 up to 12.30pm |
10.11.2009 at 2.30pm |
| RLJ-29(1166)W/09 dtd.12.10.2009 |
Name of Work |
Repairing and rrenovation of Road with bitumen emulsion and brick drain in the inner edges from gate no 1 to crossing near guest house at NEIST – Jorhat. |
Renovations of roads with cement concrete, pre-cast interlocking concrete tiles on footpath & RCC drains from gate no 5 to turning near qtr no D-20, D-20 to turning near TT hall. |
Providing concrete road from side of Main Block to Central school gate(front of Geo Science building) in NEIST campus. |
Conversion of room No. 23 of Engineering Block in to Conference Hall |
Renovation work of auditorium at NEIST, Jorhat(a) Wall panelling & Ceiling |
Renovation work of auditorium at NEIST, Jorhat(b)Replacement of Chairs |
Construction of VIP rooms over the Main Lounge of the Guest House at NEIST Jorhat |
|
29.10.2009 up to 3.00pm |
30.10.2009 at 9.30a.m. |
| No. 1(PEQ)/367/09-10/PUR/T- 245 Date 18.09.09 |
Biosafety Class II, Type A2 Benchtop cabinet 5 ft., with UV light and service fixture kit |
14.10.09 UP TO 2.30 P M |
14.10.09 AT 3.00 PM |
| No. NEIST/04/09-10/Project dtd 21.8.2009 |
Providing Un-skilled workers for Field Oriented and other project work at North-East Institute of Science & Technology (NEIST) |
14.9. 2009 up to 12.30 P.M |
14.9. 2009 at 2.30 P.M |
No. NIT/WEB/008/W/09 dtd 14.8.2009
corrindum dtd.27.8.2009 |
Providing False Ceiling to the Stationary Section of General Store and Replacing the Gutters of Store |
28.08.2009 up to 3.00pm |
28.08.2009 at 3.30pm |
No. NIT/WEB/009/W/09 dtd 14.8.2009
corrindum dtd.27.8.2009 |
Renovation of Xerox Room and the Room at its side at Library Books Section |
28.08.2009 up to 3.00pm |
28.08.2009 at 3.30pm |
| No. NIT/WEB/010/W/09 dtd 14.8.2009 |
Renovation of Floor with Ceramics Tiles of Clinical Center (Assam Type Building area |
28.08.2009 up to 3.00pm |
28.08.2009 at 3.30pm |
No.NIT/WEB/006/W-09 dtd 14.8.2009 |
Repairing and Painting of vacant qtr(B-57,59,68,71,72,C-7,12,14 &17 at NEIST, Jorhat |
26.08.2009 up to 3.00pm |
26.08.2009 at 3.30pm |
No.NIT/WEB/007/W-09 dtd 14.8.2009 |
Roof treatment work of vacant qtr(B-59,63,64,68,71,72,C-7,,14 &17 at NEIST, Jorhat |
26.08.2009 up to 3.00pm |
26.08.2009 at 3.30pm |
Advt. No.04/09-10/Security dtd 5.8.2009 |
Providing the security arrangement at (1) North-East Institute of Science & Technology (NEIST) and (2) NEIST Branch Laboratory, Naharlagun, Arunachal Ptradesh |
August 31, 2009 up to 12.30 P.M |
August 31, 2009 at 2.30 P.M |
| No. 1(PEQ)/350/09-10/PUR/T- 219 Date 03.08.09 |
HIGH SPEED REFRIGERATED MICROPROCESSOR CONTROLLED, PROGRAMMABLE CENTRIFUGE |
26.08.09 UP TO 2.30PM |
26.08.09 AT 3.00 PM |
| No. 1(PEQ)/351/09-10/PUR/T – 218 Date 03.08.09 |
1. (A) Supply of PC based Probe Sonicator
(B) Operating system
(C) Essential Accessories
2. UPS: 2 KVA |
26.08.09 UP TO 2.30 P M |
26.08.09 AT 3.00 PM |
| No.1(PEQ)/352/09-10/PUR/T- 216 Date 03.08.2009 |
Pressurized Fluid Extractor / Accelerated Solvent Extractor |
26.08.09 UP TO 2.30 P M |
26.08.09 AT 3.00 PM |
| No. 3(POQ)/69/09-10/PUR/T-216 DATE 28.07.09 |
Children park facility as listed in specification sheet |
26.08.09 UP TO 2.30PM |
26.08.09 AT 3.00 PM |
No.RLJ-29-(1160)-W/09
dtd 28.7.09 |
Installation of 2 Nos of Deep Tube Wells at NEIST campus, Jorhat |
18.8.2009 up to 3.00pm |
18.8.2009 at 3.30pm |
No. NIT/WEB/009/W-09 dated29-06-2009 |
PROVIDING PRECAST INTERLOCKING C CONCRETE TILES AT GIRL'S HOSTEL PREMISES |
06-07-09 up to 3:00 p.m |
06-07-09 at 3:30 pm |
| No.RLJ-29(1166)-W-09 dtd 15.6.2009 |
Sl.No |
Name of Work |
1. |
Repairing and rrenovation of Road with bitumen emulsion and brick drain in the inner edges from gate no 1 to crossing near guest house at NEIST – Jorhat. |
2. |
Renovations of roads with cement concrete, pre-cast interlocking concrete tiles on footpath & RCC drains from gate no 5 to turning near qtr no D-20, D-20 to turning near TT hall. |
3. |
Providing concrete road from side of Main Block to Central school gate(front of Geo Science building) in NEIST campus. |
4. |
Providing Bituminous emulsion road from crossing of workshop to Geo Science building side in NEIST campus. |
|
up to 3.00 pm 26-06-2009 |
At 3.30 pm on 26-06-2009 |
| No.NIT_WEB-007-W-09-dtd21.5.09 |
1 |
Construction of Community garage for D-type qtr. |
2 |
Construction of 4 Nos. of ecurity towers at NEIST premises. |
3 |
Modification of Car parking of Administrative Block and fixing marble to the steps of the stair case of chemical Science Bldg. |
4 |
Providing concrete interlocking pavers over the existing road of NEIST guest house premises. |
5 |
Miscellaneous painting work at main block,canteen Bldg.Security shed at Gate no.2,main gate and gate no.5. |
|
up to 3.00 pm 27.5.2009 |
at 3.30 pm 27.5.2009 |
No.RLJ-29(1088)-W/08 dtd.20.5.2009 |
1. Renovation of Director’s conference room and hall with Armstrong Mineral fibre board false ceiling DUNE RH 99, metal Orcal clip-in perforated wall tiles, QED partition panel, Automatic Sliding Frameless glass door system and 12 mm thick "SAINT GOVIND" glass with "Godrej Dorma" patch fitting including electrical works
2 Waterproofing of RCC roof with APP AQUA SHIELD 3mm/3.5 Kg Per Sqm with 50 gsm/sqmt Glassfibre in center Core (As per UEAtc MOAT 27-1983 and MOAT 30-1984).. |
up to 3.00 pm 3.6.2009 |
at 3.30 pm 3.6.2009 |
No . NEIST-Elect-13/2009 dtd 28.4.09
Corrigendum dtd 18.5.2009 |
Supplying, installation, testing and commissioning of Outdoor panel Board at NEIST,Jorhat |
12.5.09 up to 3.00pm
date extended up to 26.5.2009 |
12.5.09 at 3.30pm |
| No.NIT_WEB_005_W-09_dtd30.3.2009 |
1.Renovation of floor with
Ceramics Tiles of Lounge and
Dining Hall of NEIST Guest
House
2.Renovation of Floor with
Ceramics Tiles of Front & Back
Verandah of NEIST Guest
House (Old) |
7.4.2009 up to 3.00pm |
7.4.2009 at 3.30pm |
| No.NEIST/HKCS?Lab/Col/09 dtd.24.3.2009 |
1) House-Keeping/Cleaning/Sweeping job in Laboratory Area and
(2) House-Keeping/Cleaning/Sweeping job for office buildings in the
Colony Area at North East Institute of Science and Technology, Jorhat |
20.4.2009 up to 12.30pm |
20.4.2009 at 2.30pm |
| No.NIT/Web/004/W-09 dtd.24.3.2009 |
Renovation of room No.9 of Biotechnology Division |
30.3.2009 up to 3.00pm |
30.3.2009 at 3.30pm |
| No.NEIST-Elect/2/2009 |
Supplying, installation, testing & Commissioning of Solar Light at NEIST, Jorhat |
16.03.2008 Up To 2.30pm |
16.03.2008 at 3.30pm |
| No. NIT/WEB/003/W-09 dated: 23-02-2009 |
Renovation of Room No. 9 Geo Science Lab Building for setting up of High Performance Computing Center (PARAM) at NEIST, Jorhat |
27.2.09 up to 3.00pm |
27.2.09 at 3.30pm |
| Providing Tiles Flooring on the Corridor of Geo Science Division at NEIST, Jorhat |
| Extension of Geo Science Division with a Battery Shed at NEIST, Jorhat |
| No.1(PEQ)_346_08-09_PUR_T-195 Date16.02.09 |
Refrigerated Incubator Twin Stackable Shakers |
12.03.09 UP TO 2.30PM |
12.03.09 AT 3.00 PM |
| No. 1(PEQ)/301/08-09/PUR/T- 179 Date 06.02.09 |
Solar Power System Regulated output Voltage 12 VDC, Consumption = 12V / 60 Watts constant [24 hrs.], Steel mast for roof top installation, SMF Battery 12V [2v x 6], 360 Amp Hr. [Industrial grade with steel rack mount protection] |
|
04.03.09 UP TO 2.30PM |
04.03.09 AT 3.00 PM |
| No. 1(PEQ)/309/08-09/PUR/T- 180 Date 06.02.09 |
On / Off – line Analyzer for Glucose, Source & Ethanol as per specification |
04.03.09 UP TO 2.30PM |
04.03.09 AT 3.00 PM |
| No.1(PEQ)/289/08-09/PUR/T-178 Date 06.02.09 |
GAS CHROMATOGRAPH: Microprocessor controlled, complete unit with appropriate software and data station (preferably Laptop) for analysis of different gases like SO2 H2S, N2O, N2, O2, CO, CO2 and hydrocarbon etc. in ppm level |
04.03.09 UP TO 2.30PM |
04.03.09 AT 3.00 PM |
| No.1(PEQ)/256/08-09/PUR |
Supply & Installation of PC based Software for Drilling and Well Control Simulation |
04.03.09 (17.00 HRS) |
05.03.09 (10.00 HRS) |
| No.1(PEQ)/300/08-09/PUR |
Supply & Installation of Incubator Shaker Refrigerated. |
04.03.09 (17.00 HRS) |
05.03.09 (10.00 HRS) |
| No.1(PEQ)/317/08-09/PUR |
Supply & Installation of Hydraulic Clicking Machine |
04.03.09 (17.00 HRS) |
05.03.09 (10.00 HRS) |
| No.1(PEQ)/328/08-09/PUR |
Supply & Installation of Ultra Performance HPLC System, Analytical Model |
04.03.09 (17.00 HRS) |
05.03.09 (10.00 HRS) |
| No1.PEQ.277.08-09_Enq2.2.09 |
Supply and Installation of FTIR Spctrophotometer complete with software |
18.02.09 UP TO 2.30PM* |
18.02.09 AT 3.00 PM |
| No.1.PEQ.281.08-09Enq2.2.09 |
Supply and Installation of High Speed Benchtop Centrifuge with different rotors |
25.02.09 up to2.30 P M |
25.02.09 at 3.00 P M |
| No.1.PEQ.316.08-09Enq_2.2.09 |
Sl. No. |
Description of item(s) |
Qty. |
1 |
Freeze Dryer 6 liter capacity (approx.) & remove minimum 4L water in 24h, 220 – 240V, Condenser Temp. -50ºC minimum, with purge valve and moisture sensor, LCD display of operating parameters and alarm system with: |
1 No. |
(i) |
10 - 12 port stainless steel Drying chamber |
1 No. |
(ii) |
Rotary vane vacuum pump with displacement cap 160 – 170 L / min, final vacuum 1.2x10-³ - 1.4 x 105 mbar |
1 No. |
(iii) |
Refrigeration system with minimum 0.75 – 1.0 hp, CFC free |
(iv) |
40 – 50 port Ampule Manifold Tree, OD with 0.25 inch to fit the glass ampoules. |
1 No. |
(v) |
Sealing Torch |
1 No. |
(vi) |
Glass ampules |
1 Pack. |
(vii) |
Ampule Valve Adapters |
30 Nos. |
(viii) |
Vacuum pump oil |
2 liter. |
|
18.02.09 UP TO 2.30PM* |
18.02.09 AT 3.00 PM |
| No.1.PEQ.318.08-09Enq2.2.09 |
Deep Freezer -80ºC or above |
18.02.09 UP TO 2.30PM* |
18.02.09 AT 3.00 PM |
| No.1.PEQ.331.08-09Enq2.2.09 |
Portable Multi Parameter Water Quality Monitoring System for Simultaneous Measurement |
25.02.09 up to2.30 P M |
25.02.09 at 3.00 P M |
| No.RLJ-29(1116)W/2008 dtd.21.1.09 |
Construction of toilets at Social Activity Center, Pump House and Security Gate No.4 |
27.1.2009 up to 3.00pm |
27.1.2009 at 3.30pm |
| No.RLJ-29(1133)W/2008 dtd 21.1.2009 |
Conversion of RL-23 of Engineering Block into Conference Hall |
27.1.2009 up to 3.00pm |
27.1.2009 at 3.30pm |
| No.1(PEQ)_246/08-09_PUR dtd.15.1.09 |
Laboratory Scale Jig for mineral processing (17 inch. X 25 inch) with variable stroke
length and bed screen. Feed Size: 10 mm to 1 mm, Bed material: Variable size and
density to meet different size fractions of feed. Motor: Single phase, 230 Volt, 50 Hz. |
11.02.09 UP TO 2.30 P M |
11.02.09 AT 3.00 PM |
| No.1(PEQ)_263/08-09_PUR dtd.15.1.09 |
Microwave Assisted Organic Synthesis System |
11.02.09 UP TO 2.30 P M |
11.02.09 AT 3.00 PM |
| No.1(PEQ)_267/08-09_PUR dtd.15.1.09 |
Batch Solvent Extraction and Desolventising Unit |
11.02.09 UP TO 2.30 P M |
11.02.09 AT 3.00 PM |
| No.1(PEQ)_269/08-09_PUR dtd.16.1.09 |
Computer controlled Double Beam UV-Visible Spectrophotometer with
ability to correct for blanks in real time |
11.02.09 UP TO 2.30 P M |
11.02.09 AT 3.00 PM |
| No.1(PEQ)_276/08-09_PUR dtd.15.1.09 |
Firewall: (1) One firewall for 500 users, (2) Two firewall for 100 users |
11.02.09 UP TO 2.30 P M |
11.02.09 AT 3.00 PM |
| No.1(PEQ)_304/08-09_PUR dtd.16.1.09 |
Portable flue gas analyzer |
11.02.09 UP TO 2.30 P M |
11.02.09 AT 3.00 PM |
| No.1(PEQ)_312/08-09_PUR dtd.16.1.09 |
Gas Chromatograph: Dual Flame ionization detector (FID) with Amplifier having
suitable pneumatics for make up gas (0-30 ml / min), Thermal conductivity detector
(TCD) with suitable amplifier having column dual injection ports to accept ¼ in OD
glass column with adaptors for 1/8 inch packed and 0.53 mm id wide bore columns.
1 Set.
Dual Channel chromatography data processor software with suitable cables and
interface cards complete with branded PC (latest version) LCD Monitor, Printer and
0.6 KVA UPS, G C Columns with fittings: BP – 5 (30 m x 0.53 mm id x 1.0 μm film,
BP – 20 (30 m x 0.53 mm id x 1.0 μm film
1 Set.
10% OV – 101 On chromosorb W HP 100 / 120, 2 m x 2 mm id (glass) 1 No.
10% Supelcowax 20M on W HP 100 / 120, 2 m x 2 mm id (glass) 1 No.
10% OV – 101 On chromosorb W HP 100 / 120, 2 m x 2 mm id (SS) 1 No.
10% Supelcowax 20M on W HP 100 / 120, 2 m x 2 mm id (SS) 1 No.
Porapak Q (2 m x 2 mm id, ss) 1 No.
Molecular sieve (2 m x 2 mm id, ss) 1 No.
1
Two stage gas cylinder pressure regulator, good quality (SS body, SS diaphragm)
Outlet connection adaptors inlet pressure: 0 – 280 kg cm2, Outlet: 0 – 7 kg cm2 for
Hydrogen, Nitrogen, Air gas cylinders), Manual GC syringes: 10.0 μl cap. 1.0 μl cap.
Essential recommended accessories and electronic items including installation kit e |
11.02.09 UP TO 2.30 P M |
11.02.09 AT 3.00 PM |
| No.1(PEQ)_313/08-09_PUR dtd.16.1.09 |
COMPLETE WATER PURIFICATION SYSTEM based on Reverse Osmosis and
Ultra Pure Water Polishing Station to produce water of HPLC grade |
11.02.09 UP TO 2.30 P M |
11.02.09 AT 3.00 PM |
| N I T No. II/2008-09 dtd 7.1.2009 |
Supply & Installation of Desktop Computer, Server, Printer, UPS, Networking items, Air Conditioner, Chair etc. on turnkey basis to be installed in 58 No. of Science Colleges in 8 (Eight) States in North East Region. |
|
09.02.2009 up to 17.00 HRS |
10.02.2009 at 10.00 HRS |
No.NEIST-Elect-12/2008 dtd 12.12.2008
Last date of issue of tender paper extended to 13.2.2009; Last date of submission of tender extended to 16.2.2009 |
Supplying, installation, testing and
commissioning of 150 kVA 415v 3 phase 4 wires
residential silencer diesel generator set
complete with AMF panel board etc at NEIST
Branch Laboratory, Itanagar (A.P.) |
16.02.2009 up to 3.00pm |
16.02.2009 at 3.30 pm |
Supplying, installation, testing and
commissioning of OTI and WTI in Power House
at NEIST Jorhat (Assam) |
| No.NEIST/NIT/01/Pharmacy/2008 dtd.12.12.2008 |
Opening a Pharmacy at the Clinical Center, NEIST, Jorhat |
06.01.2009 up to 2.30pm |
06.01.2009 at 3.00 pm |
| No.04/09-10/Security dtd 12.12.2008 |
Security contract for NEIST-Sub-station, Manipur |
19.01.2009 up to 12.30pm |
19.01.2009 at 2.30 pm |
| No.1(PEQ)/275/08-09/PUR dtd.20.11.2008 |
1. High Performance liquid chromatography with computer & printer
2.Firewall
3.Supply & installation of FTIR spectrophotometer complete with software
4. Supply & installation of high speed benchtop centrifuge with different rotors
5.Incubator shaker
6.Rotary evaporator
7.Gas chromatograph |
24.12.2008 up to 2.30pm |
24.12.2008 at 3.00 pm |
| Enq_Civil & Maintenance dtd 30.10.2008 |
S.N |
Name of Work |
1 |
Repairing renovation & conversion of A37 to A44 qtrs to Girls Hostel |
2 |
Repairing of Damaged boundary wall at Farm area |
3 |
Renovation of Community Centre with aluminium Cabin at NEIST Jorhat |
|
10.11.2008 up to 3.00pm |
10.11.2008 at 3.30pm |
| No.1.PEQ.267.08-09 Enq_dtd14.10.08 |
Batch Solvent Extraction and Desolventising Unit |
12.11.08 UP TO 2.30PM |
12.11.08 AT 3.00 PM |
| No. 1(PEQ)/268/08-09/PUR/T- 68 DATE 14.10.08 |
PHASE CONTRAST MICROSCOPE with scientific colour high resolution DIGITAL CAMERA & Imaging software and COMPUTER |
12.11.08 UP TO 2.30PM |
12.11.08 AT 3.00 PM |
| No. 1(PEQ)/269)/08-09/PUR/T- 67 Date 14.10.2008 |
Computer controlled Double Beam UV-Visible Spectrophotometer with ability to correct for blanks in real time and with following attached.Specification for UV – Visible Spectrophotometer |
|
|
|
12.11.08 UP TO 2.30PM |
12.11.08 AT 3.00 PM |
| No.13(PZ)/12/08-09/PUR dtd.13.10.2008 |
1 |
1(PEQ)/256/08-09/PUR |
Supply & Installation of PC based Software for Drilling and Well Control Simulation |
1 No. |
2 |
1(PEQ)/259/08-09/PUR |
Supply & Installation of Rotary Direct Injection Moulding Machine |
1 No. |
3 |
1(PEQ)/272/08-09/PUR |
Supply & Installation of Near-infrared Spectro- scopy (Food Analysis) |
1 No. |
4 |
11(PCM)/236/07-08/ PUR |
A R C of Chemicals, Glass - wares & Plastic-wares for the year 2008 -
2009 |
|
10.11.2008 up to 17.00 hrs |
11.11.2008 at 10.00 hrs |
| NIT Civil Maintenance section dated 1.10.2008 |
1. Roof treatment of clinical center
2.renovation of room 2 & 6 of Material Science Divn
3.Extension of shed near roon No.1 of Material Science Divn |
13.10.2008 up to 3.00pm |
13.10.2008 at 3.30pm |
| No. 1(PEQ)/246/08-09/PUR/T- 47 Date: 26.08.2008 |
Laboratory Scale Jig for mineral processing (17 inch. X 25 inch) with variable stroke length and bed screen. Feed Size: 10 mm to 10 mm, Bed material: Variable size and density to meet different size fractions of feed. Motor: Single phase, 230 Volt, 50 Hz |
24.09.08 UP TO 2.30 P M |
24.09.08 AT 3.00 PM |
| No. 1(PEQ)/260/08-09/PUR/T- 56 Date 27.08.2008 |
Refrigerated Incubator Twin Stackable Shaker |
01.10.08 UP TO 2.30PM |
: 01.10.08 AT 3.00 PM |
| No. 1(PEQ)/263/08-09/PUR/T- 58 Date 27.08.2008 |
Microwave Assisted Organic Synthesis System |
01.10.08 UP TO 2.30PM |
: 01.10.08 AT 3.00 PM |
| No. 1(PEQ)/257/08-09/PUR/T- 55 Date 27.08.2008 |
UV-VISIBLE SPECTROPHOTOMETER with Compatible a).COMPUTER (512 MB, 160 GB Hard disk), b). PRINTER (laser printer), c).UPS (Online, 1 KVA, Backup time: 20 to 30 min) |
01.10.08 UP TO 2.30PM |
01.10.08 AT 3.00 PM |
| No. 1(PEQ)/261/08-09/PUR/T- 57 Date 27 08.2008 |
Supply and Installation of Microwave Digestion System: |
01.10.08 UP TO 2.30PM |
01.10.08 AT 3.00 PM |
No.NEIST_16(59)_Estt_2003dtd.12.8.08
|
EMPANELMENT OF TRAVEL AGENT
Proforma_for company_profile
Terms_and_condition |
08.09.2008. up to 12.30 PM |
08.09.2008. at 2.30 PM |
| No.1(PEQ)/244/08-09/PUR/ T – 35 Date 07.08.08 |
Multiparameter water quality monitoring system: pH range: 0 to 14, accuracy 0.002 or better. Dissolved Oxygen: 0.00 to 20.00 mg / 1 or more. Relative accuracy ± 1 digit. Conductivity: Up to a maximum of 10 s / m (Relative accuracy ± 0.01 mS/cm, TDS: Up to 100 mg / L or better. (Accuracy 0.5% or better). Ion sensors (with reference assembly) for nitrate, fluoride, cyanide, sulfide, nitrite, cadmium & standard solutions for each. Provision for mains as well as battery operation. The system should be comparable to PC & printer. Complete installation, manual in English, user list with Fax & Phone number, warrantee & AMC proposal |
10.09.08 UP TO 2.30 P M |
10.09.08 AT 3.00 PM |
| No. NEIST-Elect-7/2008 dtd 5.8.08 |
1 |
Supplying, installation, testing and commissioning of 150 kVA 415v 3 phase 4 wires residential silencer diesel generator set complete with AMF panel board etc at NEIST Branch Laboratory, Itanagar (A.P.) |
2 |
Replacement of overhead distribution line by underground cable at NEIST Jorhat (Assam) |
3 |
Service connection to Administrative Block at NEIST Jorhat (Assam) |
4 |
Electrical renovation works to Room No. 7 , 13 and Autoclave room in Bi-Technology Division at NEIST, Jorhat (Assam) |
|
1.9.2008 up tp 3.00 pm |
1.9.2008 at 3.30 pm |
| No.ESU/01/2008 dtd.1.8.2008 |
Renovation / modification of Portico and front Veranda of main block |
Renovation of Conference Hall at Main Building (GF) |
Extension of the X-ray room at Analytical Block for installation of single X-ray diffractometer |
Conversion of H-06 to Dinning Hall for Guest House Annexure-1 |
Outside painting of Calorimetric Study Centre & approach to Incinator Shed |
Construction of wall for enclosing water treatment plant at Main ump House |
|
11.08.08 up to 3.00 PM |
11.08.08 at 3.30 pm |
| No. NEIST/03/08-09/Project dtd.31.7.08 |
Providing Un-skilled workers for Field Oriented and other project work at North-East Institute of Science & Technology |
04.09.2008 up to 12.30 p.m. |
04.09.2008 at 2.30 P.M |
| No.NEIST-Elect/215 dtd.21.7.2008 |
Electrical renovation works to Director residence at NEIST, Jorhat |
06.08.2008 up to 2.30pm |
06.08.2008at 3-30 PM |
| No. 1(PEQ)/234/08-09/PUR/T- 27 Date: 07.07.08 |
800 Kg / batch distillation unit (Stainless Steel) for distillation of Lemon Grass herb consisting with grass tank, condenser, water heating arrangement (both Firewood & Coal) with lid lifting system and universal separator complete with all accessories including transportation, installation and trial run. The unit has to be delivered and installed at Itanagar of Arunachal Pradesh. (Details specifications as per attach sheet) |
30.07.08 UP TO 2.30 P M |
30.07.08 AT 3.00 PM |
| No.03/08-09/Security dated 4.7.08 |
Security arrangement at NEIST, Jorhat and NEIST Branch, Naharlagun |
29.7.2008 up to 12.30pm |
29.7.2008 at 2.30 pm |
| No.BLI/NIT/03/2008 dated 4.7.08 |
Providing Safaiwalas and Unskilled workers at NEIST Branch, Naharlagun |
28.7.2008 up to 12.30pm |
28.7.2008 at 2.30 pm |
| No. 1(PEQ)/225/08-09/PUR/T- 03 Date 21.04.08 |
Solar Power System |
14.05.08 UP TO 2.30 P M |
14.05.08 AT 3.00 PM |
| No.BLI/NIT/02/2008 dated 28.3.2008 |
Providing two numbers of Safaiwalas and un-skilled workers for Branch Laboratory, Itanagar on contract basis |
30.04.2008 up to 12.30pm |
30.04.2008 at 2.30pm |
| No.NEIST-Elect/204dtd.26.3.2008 |
Electrical renovation works to Petroleum & Natural Gas Division, Room No. 22 at NEIST, Jorhat |
09.04.2008 up to 2.30 pm |
09.04.2008 at 3.30 pm |
| No. NIT/04/07 dated 11.3.2008 |
Services of washing of different kinds of official cloths |
31.03.2008 up to 2.30 pm |
31.03.2008 at 3.30 pm |
| No.NEIST-Elect/200/208/209 dated 10.3.08 |
1.Underground Service Connection and electrical renovation works to Analytical Chemistry, Room No. 19 at NEIST, Jorhat,
2.Overhauling of ceiling fan in Colony campus at NEIST, Jorhat
3.Overhauling of ceiling fan in Laboratory campus at NEIST, Jorhat |
18.03.2008 up to 2-30 PM |
18.03.2008 at 3.30pm |
| No.NEIST-Elect/202 dtd 27.2.2008 |
Electrical renovation works to
A-29 to A-44(Girls Hostel) at NEIST, Jorhat |
05.03.2008 UP TO 2.30 P M |
05.03.2008 AT 3.00 PM |
| No. 1(PEQ)/86/06-07/PUR/T- 190 Date: 01.02.2008 |
Supply & Installation of Portable Multiparameter Water Quality Monitoring System For Simultaneous Measurement of following parameters |
27.02.08 UP TO 2.30 P M |
27.02.08 AT 3.00 PM |
| No.1(PEQ)/163/07-08/PUR/T-200 dated 12.2.2008 |
1.Thermoplastic Top Puff Coupling Machine, 2.Heel Part Steaming Machine, 3.Roughing Machine, 4. Toe Upper Steaming Machine, 5. Cement Reactivating Machine |
4.3.2008 up to 2.30 P M |
4.3.2008at 3.00 P M |
| GNIT No.II/2007-08 dated 11.2.2008 |
1.Supply, installation of Automatic High Resolution X-Ray Diffractometer with theta theta Goniometer
2.ARC of chemicals, glass wares, plastic wares for the year 2008, 2009 |
6.3.2008 up to 5.00pm |
7.3.2008 at 10.00am |
| No.03/2007-08/Floriculture(JC) dated 26.7.07 |
Job contract for providing service to maintain Floriculture/Garden Job |
30.8.07 up to 12.30pm |
30.8.07 at 2.30pm |
|
|
Manpower( unskilled workers) for Labour Contract for Floriculture/Garden work at NEIST, Jorhat
|
23.8.2007 up to 12.30 PM |
23.8.2007 at 2.30 PM |
|
|
1. High Speed Refrigerated Laboratory Centrifuge
2. Rotor Capacity
3. Fixed Angle Rotor
|
22.8.2007 up to 2.30 PM |
22.8.2007 at 3.00 PM |
| |
|
|
|
| No.13(PZ)/12/07-08/PUR dated 20.7.07 |
1. Direct injecting machine
2. Bioreactor system
3.Atomic absorption spectrometer of high performance
4.Fully automated CCD Detector based single crystal X-Ray diffractometer system |
30.8.2007 up to 17.00 hrs |
31.8.2007 at 10.00 hrs |
| No.1(PEQ)/120/06-07/PUR dated 2.7.07 |
Bench-top freeze dryer |
1.8.07 up to 2.30pm |
1.8..07 at 3.00pm |
| No.1(PEQ)/108/06-07/PUR dated 2.7.07 |
Vacuum coating unit (Thermal evaporation unit) |
1.8.07 up to 2.30pm |
1.8..07 at 3.00pm |
| No.(PEQ)/120/06-07/PUR dated 3.5.07 |
Bench Top Freeze Dryer |
30.5.07 up to 2.30pm |
30.5.07 at 3.00pm |
| |
|
|
|
| No.02/07-08/security dated 30.5.2007 |
Security arrangement at NEIST, Jorhat and NEIST, Branch, Naharlagun |
29.6.2007 up to 12.30pm |
29.6.2007 at 2.30pm |
| No.RLJ_NIT/LAB/COLONY/01/2007dated 5.3.07 |
(1) House-Keeping/Cleaning/Sweeping job in Laboratory Area and (2) House-Keeping/Cleaning/Sweeping job for office buildings in the Colony Area |
30.03.2007 up to 12.30 P.M.. |
30.03.2007 at 12.30 P.M.. |
| No.1(PEQ)/113/06-07/PUR/T-302 dated 27.2.07 |
Three Phase multifunction precision power meter |
19.3.07 up to 2.30pm |
19.3.07 at 2.30pm |
| 1(PEQ)/66/06-07/PUR/T-297 dated 23.2.07 |
Supply and installation of portable flue gas analyzer for the ...... |
19.3.07 up to 2.30pm |
19.3.07 at 3.00pm |
| No.1(PEQ)/54/06-07/PUR/T-296 dated 23.2.07 |
Refrigerated bench top centrifuge |
19.3.07 up to 2.30pm |
19.3.07 at 3.00pm |
| No.1(PEQ)/59/06-07/PUR/T-289 dated 19.2.2007 |
P2 DVCPRO HD MEMORY CARD CAMERA RECORDER |
14.03.2007 up to 2.30pm |
14.03.2007 at 3.00pm |
| No.1(PEQ)/59/06-07/PUR/T-289 dated 19.2.2007 |
Solar power system for remote unmanned VSAT observatiries located within Lat.22-29o N,Long.90-98oE |
14.03.2007 up to 2.30pm |
14.03.2007 at 3.00pm |
| REVISED TENDER ENQUIRY 04/06-07/PUR/T-270 DATE : 16.02.2007 |
Desk top PC, Laser Printer, UPS, Pen Drive, Flat bed scanner |
07.03.07 UP TO 2.30 P M |
07.03.07 AT 3.00 PM** |
| TENDER ENQUIRY No. 1(PEQ)/108/06-07/PUR/T- 284 DATE: 15.02.2007 |
Vacuum Coating Unit (Thermal evaporation unit) |
07.03.07 UP TO 2.30 P M |
07.03.07 AT 3.00 PM** |
| No.RLJ/NIT/Re-Tend/Project/07 dated 14.2.2007 |
Providing un-skilled workers for field oriented & other project work |
14.03.2007 UP TO 12.30 P M |
14.03.2007 at 2.30pm |
| No. 1(PEQ)/104/06-07/PUR/T- 271 DATE: 05.02.2007 |
Supply & Installation of INCINERATOR WITH ALL TYPES OF POLLUTION CONTROL ACCESSORIES |
28.02.07 UP TO 2.30 P M |
28.02.07 AT 3.00 PM |
| TENDER ENQUIRY 04/06-07/PUR/T-270 DATE : 01.02.2007 |
Desk top PC, Laser Printer, UPS, Pen Drive, Flat bed scanner |
21.02.07 UP TO 2.30 P M |
21.02.07 AT 3.00 PM |
1(PEQ)/86/06-07/PUR/T- 250 DATE: 02.01.2007 |
Supply & Installation of Portable Multi-parameter Water Quality Monitoring System For Simultaneous Measurement |
29.01.07 UP TO 2.30 P M |
29.01.07 AT 3.00 PM |
| No. 1(PEQ)/87/06-07/PUR/T- 252 DATE: 04.01.2007 |
Supply & Installation of Automatic Bomb Calorimeter (Microprocessor based) |
05.02.07 UP TO 2.30 P M |
05.02.07 AT 3.00 PM |
| NO. BLI/NIT/01/2006 dated 4.01.2007 |
Safaiwalas and un-skilled workers for Branch Laboratory, Itanagar |
24th January, 2007 up to 12.30 p.m |
24th January, 2007 at 2.30p.m. |
| Global Press Advertisement No.III/2006-07 dated 26.12.06 |
1. Supply & Installation of Surface Area & Pore Analyzer |
2. To Create a LAN system RRL Branch Laboratory, Itanagar, RRL Sub-Station, Lamphlet, Imphal, Manipur along with some extension of existing LAN at RRL Jorhat. |
3. To create Video conference facility at RRL Jorhat, RRL Branch Laboratory, Itanagar & RRL Sub-Station, Lamphlet, Imphal, Manipur |
4. Supply & Installation of Direct Moulding Machine |
5. Supply & Installation of Broadband Seismic Sensors with training. |
|
Last date & Time for submission: January 24, 2007 (15.00 HRS) for item No. 2 & 3
Last date & Time for submission: February 07, 2007 (15.00 HRS) for item No. 1,4 & 5
|
Date/Time for Opening of Tech. Bids: January 24, 2007 (15.30 HRS) for item No. 2 & 3
Date/Time of Opening of Bids: February 07, 2007 (15-30 HRS) for item No. 1,4 & 5 |